Two-Tiered Loading

Depending on the model of your pick-up, an upper load platform can be created by positioning three or four 5 cm (2 inches) by 15 cm (6 inches) wooden planks across the width of the pickup box. The planks must be inserted in the pickup box depressions.

When using this upper load platform, be sure the load is securely tied down to prevent it from shifting. The load's center of gravity should be positioned in a zone over the rear axle. The zone is located in the area between the front of each wheel well and the rear of each wheel well. The center of gravity height must not extend above the top of the pickup box flareboard.

Any load that extends beyond the vehicle's taillamp area must be properly marked according to local laws and regulations.

Remember not to exceed the Gross Axle Weight Rating (GAWR) of the front or rear axle.

    See also:

    Instrument Cluster
    English Light Duty Premium Shown. Metric, Uplevel, Base and Heavy Duty Similar. For vehicles with a DURAMAX® Diesel engine, see the DURAMAX® Diesel Supplement for more information. For vehicle ...

    Power Seats
    To adjust a power seat, if equipped: • Move the seat forward or rearward by sliding the control forward or rearward. • If available, raise or lower the front or rear part of the seat cushion ...

    Electrical System Overload
    The vehicle has fuses and circuit breakers to protect against an electrical system overload. When the current electrical load is too heavy, the circuit breaker opens and closes, protecting the circui ...